Case Study 4 – Tanda (440 MW)

Tanda Thermal Power Station was taken over by NTPC on 15 January 2000. The PLF of the power station improved from 21.59% at the time of the takeover to 82.02% for the year 2014-15.

Case Study 4

Tanda (440 MW)
Tanda 440 MW turnaround performance